Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study - Université de technologie de Troyes Accéder directement au contenu
Article Dans Une Revue Applied Sciences Année : 2021

Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study

Résumé

This paper aims to study a real case of an optimization problem derived from a hospital supply chain. The present work focuses on developing operational decision support models and algorithms for production process scheduling in hospital catering. The addressed production system is considered as a flexible job shop system. The objective is to minimize the total flow time. A novel mathematical model and two metaheuristics for the production scheduling of multi-product and multi-stage food processes are developed. These methods have proven their effectiveness for the scheduling of operations of the food production processes and allowed significant improvements in the performance of the studied production system.
Fichier principal
Vignette du fichier
Flexible_Job_Shop_Scheduling_Problem_with_Sequence_Dependent_Setup_Time_and_Job_Splitting__Hospital_Catering_Case_Study.pdf (1.64 Mo) Télécharger le fichier
Origine : Fichiers éditeurs autorisés sur une archive ouverte

Dates et versions

hal-03149757 , version 1 (23-02-2021)

Identifiants

Citer

Fatima Abderrabi, Matthieu Godichaud, Alice Yalaoui, Farouk Yalaoui, Lionel Amodeo, et al.. Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study. Applied Sciences, 2021, 11 (4), pp.1504. ⟨10.3390/app11041504⟩. ⟨hal-03149757⟩
56 Consultations
61 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More