Fuzzy Rules for Joint Integration of Production Schedule and Maintenance Planning

Abstract : The relationship between production and maintenance has always been considered as a conflict in management decision. Most studies dealing with this problem adopt the approach commonly called “scheduling with availability constraints” [1] [2], where a fixed number of preventive maintenance (PM) activities are planned first then the scheduling of production jobs is optimized considering the PM actions as constraints. Recently, integrated models have been proposed to deal with the two activities simultaneously [3] [4] [5]. Multi objective techniques have been developed to find trade-off solutions to the problem. However, one of the important issues which can influence the quality and efficiency of the obtained solutions is the insertion strategy of production jobs and PM activities to avoid conflicts and gain efficiency. In this paper, we study four types of priority rules to optimize both criteria of production and maintenance simultaneously in parallel machine shop. Rules based on fuzzy logic are proposed and compared to other crisp strategies. Computational results based on a multi objective genetic algorithm show that scheduling rules based on fuzzy logic are effective.
Document type :
Journal articles
Complete list of metadatas

https://hal-utt.archives-ouvertes.fr/hal-02493696
Contributor : Daniel Gavrysiak <>
Submitted on : Friday, February 28, 2020 - 9:24:21 AM
Last modification on : Thursday, June 4, 2020 - 10:12:04 AM

Identifiers

  • HAL Id : hal-02493696, version 1

Collections

ROSAS | UTT | CNRS

Citation

Ali Berrichi, Farouk Yalaoui, Alice Yalaoui. Fuzzy Rules for Joint Integration of Production Schedule and Maintenance Planning. Journal of Multiple-Valued Logic and Soft Computing, Old City Publishing, 2016, 26 (6), pp.579-592. ⟨hal-02493696⟩

Share

Metrics

Record views

16